Henrich Quick
Alternative viewers:
Slide 1:BSPC Working Group on Climate Change and BiodiversityAugust 29th 2022 | Dr Henrich Quick, Head of OffshoreRenewable Energies in the Baltic SeaSlide 2:Transmission System Operator 50HertzResponsible for...The reliable electricity supply to 18 million people in the northern and eastern part of GermanyThe electricity system in Berlin, Brandenburg, Hamburg, Mecklenburg-Western Pomerania, Saxony, Saxony-Anhalt and Thuringia50Hertz corporate presentation2Slide 3:50Hertz as central player in the German energy industry350Hertz corporate presentationSlide 4:50Hertz at a glance450Hertz corporate presentation56.1%20212010~ 25%RE share of power consumption* Personnel report 2021 (situation on: 31/12/2021)of which grid turnover€1.664 billion€0.6 billionin Q1/2022:71% REin our gridSlide 5:5* Cable laying was completed in 2021August 29th 2022Slide 6:Three phases offshore wind grid connections6Can we do it?Teething phaseMaturingLarge scaleKey questionCan we do it efficiently?Can we provide all the capacity in the speed as needed?50 to 300 MWCapacity of parks connected200 to 500 MW2000 MWAC 150 kV (200 MW) First HVDC 300 kV (~400 MW)TechnologyAC 220 kV (250/300 MW) HVDC 300 kV (1 GW)HVDC 525 kV2005 - 2015Time2015- 20272027+August 29th 2022Slide 7:7The aim of the project is to initially assess a hybrid offshore interconnector in the Baltic Sea connecting the Danish island of Zealand to Germany via the island of Bornholm.Danish wind farms with an capacity of ~2 GW are to be integrated into the interconnector.In later stages, "Bornholm Energy Island" shall become a real energy hub, integrating further interconnectors (e.g. to Sweden or Poland).Both companies signed a first Cooperation Agreement at the WindEurope conference “Electric City” on November 23rd in Copenhagen.Bornholm Energy IslandAugust 29th 2022Slide 8:8Access to the German North SeaSlide 9:9NEP2035 (2021) NOR-12-2With the latest grid development plan, 50Hertz will be the TSO with two Seas in its portfolioNOR11-1 (Lanwind cluster) will be errected by 50HertzThis generation of offshore grid connections will be built 2 GW DC, 525 kV technologyLandfall will be in Schleswig-HolsteinAugust 29th 2022Slide 10:Kriegers Flak Combined Grid Solution The world ́s first hybrid interconnector10An innovative Combined Grid Solution between Denmark and Germany:Collaboration between 50Hertz and EnerginetAC Cross-border interconnector connecting 4 offshore wind farms (936 MW)Extension of existing offshore Kriegers Flak platform400 MW HVDC B2B converter in Germany to connect asynchronous gridsMaster controller allowing wind export in both countries and power exchange between Germany and Denmark (maximum capacity utilization)August 29th 2022Slide 11:Cost saving 3-cable-solution11“3-cable-solution“IberdrolaAbSOst 1-1Ost 1-3Ost 1-2“4-cable-solution“4th CableCable System | Total Length in km281 | 95.6282 | 95.0261 | 90.9265 | 6.5∑ | 288.0Cable System | Total Length in km281 | 95.6282 | 95.0261 | 90.94th Cable | 90.9∑ | 372.4In comparison of the cable costs per kilometer (2.45 m€ / km offshore & 1.65 m€ / km onshore) the roughly estimated saving amounts to ~200 m€.** Calculation takes just cable length costs into consideration. Costs for additional assets (e.g. extension of substation Lubmin) are not included.∆ km = 84.4 kmAugust 29th 2022Slide 12:What we want: future-proofing north-eastern Germany as an industrial base!12Increasing industrial demand for green electricity in north-eastern Germany50Hertz corporate presentationSlide 13:Grids to integrate power from renewable sources and allow for electrificationElectricity will remain to be a valuable commodity.Electricity contributes to the decarbonisation of energy-intensive industrial processes.Electricity needs strongand flexible grids.Electricity is an indispensablecomponent for sector coupling.Electricity is primarily used forpower supply.Electricity should be fully exploited.1350Hertz Strategic Goal 100% by 2032Slide 14:14What is about to change in the next phase of the Energy Transition?DemandSupplyFramework/ Conditions++50Hertz Strategic Goal 100% by 2032Slide 15:15Ensuring timely, secure and customized grid connectionsInvolvement in hydrogen initiativesForward-thinker in green power supplyRoundtable – platform for dialogue between politics and industryView on repoweringImplementation of an optimized process for connecting grid customers+ Customized technical grid connection solutions+ Transparency regarding suitable spots+ Demand-oriented support for grid customersAnalysis of the repowering market and development of measures to reduce repowering barriersAnalysis of further possibilities for the "green power supply" of industrial consumers; support of industry initiatives and design of own approaches50Hertz as a platform for dialogue between stakeholders in the energy transition such as politics, industry, associations, NGOs, etc. to promote exchange and to identify joint solutionsParticipation in hydrogen projects for further technical advancements and economic testing of hydrogen as a future technology100% by 2032 – Specific initiatives50Hertz Strategic Goal 100% by 2032Slide 16:Vielen Dank
Henrich Quick